Robotic System ManufacturerFANUC Authorized Since 1995Heavy-Duty Material HandlingIn-House Engineering & ProgrammingLifecycle Service & Upgrades

Industry automation

Distribution and Fulfillment Automation

Sage integrates robots, gantries, conveyors and controls to move industrial products between receiving, storage, order preparation and shipping.

Distribution and Fulfillment Automation project example

Warehouse automation designed around the product and peak flow

Distribution systems must absorb changing demand, product mix and arrival conditions while maintaining accurate material routing. The correct design depends on unit dimensions, pallet quality, peak rates, storage strategy and the interfaces to warehouse or production software.

Sage focuses on engineered handling for industrial products and unusual loads, including heavy containers, tires, drums, totes, rolls and pallets. The scope can include depalletizing, sorting, buffering, storage, retrieval and outbound palletizing.

Application data to define

  • Average and peak material flow
  • SKU count and product variation
  • Pallet and container quality
  • Storage density and retrieval priority
  • Warehouse-management interface
  • Manual exception and replenishment paths

What the system can include

Receiving automation

Unload, identify, orient and route inbound products or pallet loads into storage and production.

Automated storage

Use robotic gantries and controlled locations to store and retrieve industrial products.

Outbound preparation

Build, verify and discharge orders or pallet loads for wrapping, staging and shipment.

Project video library

See related Sage systems in operation

Frequently asked questions

Does Sage build general parcel-sorting systems?

Sage is best suited to engineered industrial material handling, especially large, heavy, bulky or nonstandard products rather than very small, high-speed parcel applications.

Can warehouse automation connect directly to production?

Yes. Controls and conveyance can coordinate storage, work-in-process buffering and production demand as one material-flow system.

Continue your application research

Bring us the application data.

Share the product, payload, rate, process sequence and available layout with a Sage applications engineer.

Discuss an Application

Send Application Requirements.

Provide your contact info and the reason for your inquiry and a Sage Automation Applications Engineer will review the inquiry the same business day.